are upcoming projects for the City of |
Current Projects
|
2012 Pavement Resurfacing Project |
Project: 2012 Pavement Resurfacing Project CIP #: 867-820287 Project Manager: Rick
Navarro Engineer’s Estimate: $1,810,000 Advertisement of Bid/Plans Available: April
8, 2012/April 10, 2012 Bid Opening: May
1, 2012 @ 2:00 P.M. Cost of Plans: $65.00 + S/H |
|
Alamo Creek Detention Basin |
Project: Alamo Creek
Detention Basin CIP #: 804-830040 Project Manager: James
Loomis Engineer’s Estimate:
$10,000,000 - $12,500,000 Advertisement of Bid/Plans
Available: March 18, 2012/March 20, 2012 Bid Opening: April 19,
2012 @ 2:00 P.M. Cost of
Plans: $70.00 + S/H |
|
EWWTP Tertiary Project –
Filtration Improvements |
Project:
EWWTP Tertiary Project – Filtration Improvements CIP
#: 822‐850081 Project
Manager: Rick Navarro Engineer’s
Estimate: $41,200,000 Advertisement of Bid/Plans Available: May 14, 2012/May 14,
2012 Bid Opening: June 21, 2012 @ 2:00 P.M. Cost of
Plans/Project Manual: $1,000.00 + S/H “PRIME
CONTRACTORS MUST PURCHASE A COMPLETE BID SET. HOWEVER, SUBCONTRACTORS MAY PURCHASE INDIVIDUAL PLAN SHEETS.” MANDATORY PRE-BID MEEETING: ·
May 31, 2012 at 10AM at the Easterly
Wastewater Treatment Plant, 6040 Vaca Station Road,
Elmira, CA (Administration Building). ·
All prospective bidders are required to attend. Bidders who fail to attend will be
considered non-responsive, and their bid will be rejected by the City. IMPORTANT NOTICE: ·
Only Bidders Pre-qualified by the City of
Vacaville may bid on this project. Any
bids from non-prequalified prime contractors will be considered
non-responsive. In addition,
any Subcontractor for the following work categories: Construction Staking, Electrical,
Earthwork, Mechanical (process piping), Mechanical (plumbing). Mechanical
(HVAC), Instrumentation, Paving, Structural Steel, and Structural Concrete
whose subcontract equates to an amount in excess of one-half of one percent
of the total bid must be pre-qualified.
Any bids which include a non-prequalified Subcontractor whose
subcontract equates to an amount in excess of one-half of one percent of the
total bid for the work categories listed above will be considered
non-responsive. THE FINAL LIST
OF PREQUALIFIED CONTRACTORS IS AVAILABLE IN PLANWELL ·
Bidders are advised that this project is
funded partially with State Revolving Funds and as such bidders must conform with the requirements of the SRF funds. Refer to the Project Manual for additional
information. REFERENCE DRAWINGS: Record
drawings of the treatment plant and copies of the plans for the EWWTP
Tertiary Project - Denitrification Improvements that is currently
under construction are available for review.
THESE ELECTRONIC FILES ARE NOT PART OF THE CONSTRUCTION CONTRACT FOR
THE PROJECT AND SHOULD BE USED FOR REFERENCE PURPOSES ONLY. |
|
|
|
|
|
|